Intelligent Rail Transit O&M System

Intelligent Rail Transit O&M System

Ensures all-round detection of electrical faults to minimize the impact on business operation
立即咨询
The product lineup includes: Intelligent O&M Big Data Platform (Central Portal), Universe Data Middle Platform, IoV Online Monitoring System, Rule Management Engine, Train Health Evaluation System, Maintenance Order Analysis and Management, Intelligent Fault Management, Train Emergency Response Management, Train E-Record System, and RAMS and Operating Data Statistics.

Features and Advantages

性能优越
性能优越
基于大数据技术的千万测点实时解析
贴近业务
贴近业务
与实际生产结合,切实解决实际问题
灵活适配
灵活适配
不同车型量身定制,适配各自规则体系
智能高效
智能高效
应用NLP、知识图谱、机器学习等技术帮助业主决策

Product Structure

Various Business Scenarios for Digitalization Construction

规程调优
规程调优
结合工况及列车数据,辅助优化维修规程
制定计划
制定计划
通过实时数据分析和业务数据洞察,补充维修计划
管理决策
管理决策
帮助管理层考核评估维修部门、供应商,洞察管理风险
维修执行
维修执行
自动沉淀最佳实践,高效维修排故
辅助运营
辅助运营
正线运营出现问题时,快速解决问题,降低事故影响
全生命周期管理
全生命周期管理
以列车和设备视角汇总信息,形成动态化、系统化的设备健康档案

Related Case

The intelligent train O&M system helps a city's subway system effectively improve operation efficiency.
The increasing number of trains and extended operation time put the train O&M under bigger pressure. Our system can keep track of a train's mainline status, as well as the condition and faults of key equipment in real-time, and conduct data analysis based on a large amount of equipment status data.
Learn more
The intelligent train O&M system helps a city's subway system effectively improve operation efficiency.
Safety management platform for Beijing Subway
The business data of different systems scattered around the organization is analyzed and stored in a centralized way, and is connected and shared between systems efficiently for business correlation analysis. The fault and alarm information of different rail transit systems is also monitored centrally.
Learn more
Safety management platform for Beijing Subway
CRRC Haitai big data platform and PHM
The overall after-sales O&M process has been standardized, an emergency center established, and the emergency response becomes faster. Procedures for storing and using spare parts have been established and strictly implemented for each site to optimize the storage strategy of spare parts. A record is created for each train on which Haitai equipment is used and the health of braking equipment is evaluated in real time to realize "condition-based maintenance", instead of corrective maintenance.
Learn more
CRRC Haitai big data platform and PHM
Tel

Business Hotline

4006-538-899

Reception

010-64303888
Online Consult

Scan QR code
Consult Now

Back to Top